Contractor Bid Comparison
Already have contractor bids? Compare them side-by-side before choosing. ScopeCraft finds missing scope, unclear exclusions, pricing differences, and risk areas.
What you get
- Side-by-side bid comparison
- Missing scope and exclusions
- Pricing differences and risk areas
- Contractor follow-up questions
- Plain-English summary
How it works
- Paste or upload 2–3 contractor bids
- ScopeCraft analyzes them together
- Get a structured report in under a minute
- $29 one-time — no subscription
- Compare bathroom, roofing, and other residential contractor bids
Sign in to compare your bids
Create a free account or sign in to submit your own contractor bids. The full report is a one-time $29 payment.
Want to see what a report looks like first? View a sample report
See what your comparison report looks like
Upload two or more contractor bids and ScopeCraft organizes the differences, missing scope, exclusions, risk flags, and follow-up questions in one place.
Lowest stated price
Summit Bath & Tile
Most complete
Prestige Remodeling Group
Most unclear language
FastBuild Contractors
What to watch
- Owner-supplied or excluded materials affect final cost
- Permits not addressed by one contractor
- Warranty terms unclear for FastBuild
| Category | Summit Bath & Tile | FastBuild Contractors | Prestige Remodeling Group |
|---|---|---|---|
| Total Price | $26,200 | not stated | $31,500 |
| Demolition / Removal | Full demo down to studs and subfloor | Demo included | Complete demolition to studs and subfloor |
| Labor | All labor included in total price | Labor price: $19,800 | Included in total price |
| Materials | Waterproofing membrane, backer board, tile setting materials | Tile, fixture/hardware, lighting | Backer board, waterproofing, Schluter system, setting materials, grout, caulk |
| Permits | Building permit included; plumbing and electrical permits separate if required | Homeowner should check with the town | All permits pulled by Prestige and included |
| Disposal | Debris disposal included | Cleanup mentioned; debris haul-off not clearly stated | All debris removed within 24 hrs |
| Prep Work | Subfloor repair up to 20 sq ft | Framing if needed | Inspect subfloor condition after demo |
| Exclusions | Fixtures, tile, drain, shower valve trim, vanity, mirrors, light bars, exhaust fan | Ceiling opening for drain move, licensed electrician for panel work | Owner-supplied fan, tile, vanity, tub, mirrors, light bars |
| Allowances | None | Tile: $800, fixture/hardware: $1,200, lighting: $400 | None |
| Warranty | 2 years on tile installation and waterproofing | We stand behind our work | 3-year labor, 1-year plumbing |
| Payment Terms | 33% deposit, 33% mid-project, 34% on completion | 50% to start, 50% on completion | 25% at signing, 25% at demo complete, 25% at rough-in inspection, 25% at final |
| Schedule / Timeline | 12–15 business days | Roughly 2 weeks | 14–17 business days after permit |
Bid Gaps & Clarifications
3 gaps
Excluded / owner-supplied
- Fixtures, tile, drain, shower valve trim, vanity, mirrors, light bars, exhaust fan
Unclear language
- Ceiling access additional cost
- Electrical circuit capacity
7 gaps
Not clearly stated
- Total price not stated
- Debris haul-off not clearly stated
Excluded / owner-supplied
- Ceiling opening for drain move excluded
- Licensed electrician for panel work excluded
Unclear language
- Reasonable plumbing changes
- Permits responsibility
- Warranty details
1 gap
Excluded / owner-supplied
- Owner-supplied fan, tile, vanity, tub, mirrors, light bars
Change-Order Risk Flags
2 flags
- Owner-supplied or excluded materials affect final cost
- Electrical capacity requirement unclear
2 flags
- Permits not addressed
- Warranty terms unclear
1 flag
- Owner-supplied or excluded materials affect final cost
Questions to Ask Each Contractor
2 questions
- What is the cost if ceiling access is required?
- Can you clarify the electrical circuit capacity requirements?
3 questions
- Can you clarify what 'reasonable plumbing changes' includes?
- Who is responsible for obtaining and paying for permits?
- Can you provide more details on the warranty coverage and duration?
No recommended follow-up questions.
Consider creating a ScopeCraft scope for a stronger comparison baseline to ensure all bids are evaluated on equal terms.